THERMOSELECT
Facility in Fondotoce / Italy
The THERMOSELECT process concept was developed at the end of the nineteen
eighties. Following detailed preliminary trials on the coking and gasification
performance of waste, the design of a large scale pilot facility was carried out in
1991.
In 1991/1992 the facility in Fondotoce was constructed on the banks of the Lago
Maggiore with a waste treatment capacity of 30,000 tonnes per year and commenced
operations in March 1992. The equipment was tested in practical operation for
several years and was continuously optimised. Leading international testing institutes
such as the German TÜV analysed the machines’ operations, the quality of the
recovered products and the level of emissions and attested excellent results.